2 TPH boiler commissioned at Ms Rana Frozen Foods |
The chamber is completely submerged in water and therefore the grate bars are mounted within the chamber. The fuel is fired on the grate and therefore the flue gases travel within the smoke tubes of second and third pass.
A Water pre-heater could also be provided of shell and tube design to reinforce the potency of the systems by convalescent waste heat from flue gases going out of the boiler.
Advantages:-
- Large convective heating surface within the second and third pass tubes ensures wonderful heat transfer
- Large water holding and steam holding area offers fast response to unsteady steam demands.
- Dry steam reduces the time interval, saves steam and improves quality of processed product
- Horizontal prepackaged boilers – less site work & fast authorization
Capacity:
Intech is accessible in capacities from 0.3 TPH to four TPH
2 TPH boiler commissioned at Ms Rana Frozen Foods |
http://bit.ly/1CrHuly
ReplyDeletesanrepcia_i Brian Vonk https://wakelet.com/wake/pc25ZpOiBGx8kryEXjJUA
ReplyDeleteanacbluron
inyc0castge Nikki Marie link
ReplyDeleteclick here
click
download
clinlatabmarg
Mterpbiriapa Dereck Goon Adobe Acrobat Pro DC
ReplyDeleteSketchup
WonderShare Recoverit
orestworun
fulccurZab-nFayetteville Jacobi Greene
ReplyDeleteSoftware
arnolegat